References

Public utility design

  • Zugló City Center, utility planning – final design
  • SOTE University Educational Center – utility planning
  • New Transport Museum, Inland Water Utility Network – Draft Plan Designs
  • Kiskundorozsma International Measuring Station drilled well and its accessories – final designs
  • Unloading of the unified system sewerage network of the city of Szentendre – preliminary water right permit
  • Duna Terasz Project, phase III, public utilities – permit and final designs
  • Tiszaújváros, MOL Petrolkémia Zrt SSBR factory, K-8. road SSBR southeast entrance and U-3. road SSBR northwest entrance widening – permit and final designs
  • Székesfehérvár, Árpád House Territorial aspect of the central structure planned in the program, utilities – study design
  • Budapest Athletics Stadium, utilities – concept design, permit and final designs
  • Planning for water retention and land use change in the Ős-Drava Program – construction of pressure pipe – concept design, permit and final designs
  • Development of National Industrial Park Management and Development Company (NIPÜF) Páty Industrial Park, ‘G’ building water utilities – permit and final designs
  • Csór-Székesfehérvár route selection – study design
  • Dunaújváros public water supply, construction of a new tentacle well – permit and final designs
  • Tiszaújváros, MOL Petrolkémia Zrt SSBR project OSBL external utilities M7 rainwater collection channel – permit and final designs
  • Danubio project – apartment house of 355-flats, water utilities – permit and final designs
  • Harsánylejtő real estate development phase II, utilities – permit and final designs
  • Budakeszi wastewater treatment plant exploration road – permit, final designs and tender documentation
  • Hungrana Kft. project called “water base development”- permit and final designs
  • Tiszaújváros, MOL Petrolkémia Zrt SSBR project Connection of OSBL exterior utilities and roads in the factory area – permit and final designs
  • Main parts of South Buda sewage system – final designs
  • Drainage of rainwater in Szentendre Downtown – study design
  • Expansion of the existing sewerage network of the city of Miskolc – permit and final designs
  • Planning of utility within the park reconstruction related to the establishment of the University of Public Service, “Ludovika Campus” – concept design, permit and final designs
  • University of Public Service, new educational building, utility design – permit and final designs
  • University of Public Service, Sports Center, utility design – permit and final designs
  • Reconstruction of Paks Nuclear Power Plant, courtyard pipelines – final designs
  • South Buda Regional Wastewater drainage – water rights implementation approval designs

Wastewater treatment and mechanics

  • Piliscsaba wastewater treatment plant expansion – permit and final design
  • Kvassay pumping station mechanical reconstruction – final design
  • Pók street wastewater lifting plant development – permit, final and tender design
  • Expansion of the hydraulic capacity of Veresegyháza wastewater treatment plant to 7000 m3 / d. – water rights implementation approval designs
  • Elaboration of the long-term development and expansion concept of the Veresegyháza wastewater treatment plant for a capacity of 9000 m3 / d – experts’ report
  • Mobile wastewater treatment plant in Soponya – preliminary and establishing water right permit
  • Répcelak and its area wastewater treatment plant –
  • permit and final designs
  • Gyöngyös and its area wastewater treatment plant –
  • proposal documents, volume III, IV., V.
  • Development of Szentendre wastewater treatment plant – proposal documents, volume III, IV., V.
  • Development of wastewater treatment plant in Vác (KEHOP-2.2.2-15-2016-00051) – proposal documents, volume III, IV., V.
  • Expansion of a biogas plant at the Vác and Dunakeszi wastewater treatment plant – preparation of a tender plan in accordance with the FIDIC’s yellow book procedure
  • Development of a wastewater treatment plant in Vác – Design for Establishing Water Right Permit Application and preparation of public procurement technical documentation
  • New wastewater treatment plant in the city of Budakeszi – design for establishing and building water right permit application and final designs
  • Establishment of a biogas plant in Pécs – Feasibility Study, Design for Establishing and Building Water Right Permit Application
  • Reconstruction of the wastewater and rainwater drainage system of Paks Nuclear Power Plant (Paksi Atomerőmű Zrt)., Partial reconstruction of the sewage treatment plant – final designs
  • Kazincbarcika-Berente area composting plant – permit designs
  • Expansion of the Csepreg wastewater treatment plant –
  • design for establishing water right permit application
  • Establishment of a biogas plant in Miskolc – feasibility study, design for establishing and building water right permit application, final design level tender design
  • Development of the wastewater treatment plant of Nagykőrös – permit and final designs
  • MOL, D8701 Transform of oil trap – EPC (Engineering Procurement Construction) offering tender documentation
  • Ráckeve-Soroksár branch of the Danube Water – water engineering design of South Pest’s channel intake and engine compartment – permit design
  • Modernization of the disinfection of the Kőbánya Waterworks – final design
  • Replacement of water structures in Esztergom, at Kossuth Bridge and Molnár street – study design
  • Reconstruction of Budapest Waterworks’s yard at Gilice square – final design
  • Borsodchem general design of settling pool – hydraulic calculation, permit and final designs
  • Gyálai Holt-Tisza channel intake structure and related facilities – permit design and proposal documentation volumes III, IV, V.
  • Budapest Central Waste Water Treatment Plant /BCWWTP/, Expansion of a non-utility domestic wastewater receiver – final designs
  • Complex reconstruction of Hódmezővásárhely regional water system phase I, mechanical works – permit design and proposal documentation volumes III, IV, V.
  • Budapest Waterworks, Testvérhegy II. renovation of engine compartment – final design
  • Budapest Waterworks, renovation of engine compartment at Szabadsághegyi basin – final design
  • Budapest Waterworks, Csepel treatment plant, Installation of UV disinfectant – final designs
  • MOL Establishment of an independent channel intake at Dunai Finomító – study design
  • Békásmegyer reconstruction of engine compartment phases 2, 3, 4 – final designs
  • CSEPEL III. 400-450 MWe cooling water supply for a combined cycle gas turbine power plant – design for preliminary water right permit application
  • Kőbánya waterworks, modernization of disinfection -final designs
  • TVK/TIFO sites industrial water supply, long term – feasibility study
  • TVK/TIFO sites industrial water supply, short term – feasibility study
  • Paks Nuclear Power Plant external facilities of reserve water preparation’s reconstruction – final designs
  • Budapest Central Waste Water Treatment Plant /BCWWTP/, Reconstruction works of Vas Gereben Street Pumping Station – final designs
  • Győr, Modernization of the pumping station in Dél-Nádorváros – concept design
  • Paks Nuclear Power Plant, fresh water cooling of the establishment blocks – feasibility study
  •  
  • MOL, D8701 Transform of oil trap – EPC (Engineering Procurement Construction) offering tender documentation
  • Ráckeve-Soroksár branch of the Danube Water – water engineering design of South Pest’s channel intake and engine compartment – permit design
  • Modernization of the disinfection of the Kőbánya Waterworks – final design
  • Replacement of water structures in Esztergom, at Kossuth Bridge and Molnár street – study design
  • Reconstruction of Budapest Waterworks’s yard at Gilice square – final design
  • Borsodchem general design of settling pool – hydraulic calculation, permit and final designs
  • Gyálai Holt-Tisza channel intake structure and related facilities – permit design and proposal documentation volumes III, IV, V.
  • Budapest Central Waste Water Treatment Plant /BCWWTP/, Expansion of a non-utility domestic wastewater receiver – final designs
  • Complex reconstruction of Hódmezővásárhely regional water system phase I, mechanical works – permit design and proposal documentation volumes III, IV, V.
  • Budapest Waterworks, Testvérhegy II. renovation of engine compartment – final design
  • Budapest Waterworks, renovation of engine compartment at Szabadsághegyi basin – final design
  • Budapest Waterworks, Csepel treatment plant, Installation of UV disinfectant – final designs
  • MOL Establishment of an independent channel intake at Dunai Finomító – study design
  • Békásmegyer reconstruction of engine compartment phases 2, 3, 4 – final designs
  • CSEPEL III. 400-450 MWe cooling water supply for a combined cycle gas turbine power plant – design for preliminary water right permit application
  • Kőbánya waterworks, modernization of disinfection -final designs
  • TVK/TIFO sites industrial water supply, long term – feasibility study
  • TVK/TIFO sites industrial water supply, short term – feasibility study
  • Paks Nuclear Power Plant external facilities of reserve water preparation’s reconstruction – final designs

Structural design

  • Implementation of Kurca water level control structures – final designs
  • Rafting track of Kisköre – permit designs
  • Planning for water retention and land use change in the Ős-Drava Program channel intake construction 5 m3/sec – concept design- permit and final designs
  • Making Hattyas pumping station reversible in the framework of the project “Reconstruction of the Gyálai Holt Tisza”, channel intake construction and its related facilities – design for establishing water right permit application and tender documentation
  • Budapest, Giant jumping tower in Batthyány Square – final designs
  • Water tower of Debrecen – revision of modernity
  • Large surface construction in IVth district of Budapest, (Budapest Waterworks) – experts’ report and study design
  • MOL Establishment of an independent channel intake at Dunai Finomító – study design
  • Sziget II (Island II) – Balpart II (Left Side II) under surface conductor – study and final designs
  • Water tower of Szolnok – concept designs
  • Floodplain ecological corridor of Kisköre barrage, fish ladder – final designs
  • Rehabilitation of the Mártély backwater for habitat protection purposes – design for establishing water right permit application, tender and final designs
  • National port of Győr-Gönyű, mouth structure – concept, design for establishing water right permit application and tender designs

Flood protection

  • Pest-North flood protection, sections 101, 37 and 38 – permit and tender design
  • Aranyhegyi stream flood protection phase 2 – final design
  • Szeged, Additional flood protection facility associated with the Pick Arena – design for establishing water right permit application and final designs
  • Pünkösdfürdő (Barát brook) flood protection facility – final designs
  • Aranyhegyi brook flood protection facility, phase I. – final designs
  • Flood protection of the Budapest Athletics Stadium – concept, design for establishing water right permit application and final designs
  • North Buda flood protection section – preparation of a concept for a preliminary feasibility study
  • Middle Buda flood protection section – preparation of a concept for a preliminary feasibility study
  • Flood protection of Danube Arena – design for establishing water right permit application and final designs
  • Reconstruction of Malina’s shore protection under Újszeged – final design
  • “Danube Project” embankment development on the 01.05 protection section of the Mosoni Danube and on the 01.07 protection section of the Mosoni Danube on the right bank – final designs
  • Construction works of embankment development on the island of Szentendre on the 02.07 protection section of the “Danube Project” – final designs
  • Development of a new line of defence for the protection of Mecsér and Dunaszentpál villages on the 01.05, 01.07 protection section of the “Danube Project” – final designs
  • Rebuilt of embankment at Tát, Kenyérmezei and Unyi brooks – final designs
  • Flood protection development of the Danube promenade in Szentendre with a mobile dam – final designs
  • Flood protection development of Szeged river wall with mobile dam – design for establishing water right permit application, tender and final designs