References

Public utility design

  • Zugló City Center, utility planning – final design
  • SOTE University Educational Center – utility planning
  • New Transport Museum, Inland Water Utility Network – Draft Plan Designs
  • Kiskundorozsma International Measuring Station drilled well and its accessories – final designs
  • Unloading of the unified system sewerage network of the city of Szentendre – preliminary water right permit
  • Duna Terasz Project, phase III, public utilities – permit and final designs
  • Tiszaújváros, MOL Petrolkémia Zrt SSBR factory, K-8. road SSBR southeast entrance and U-3. road SSBR northwest entrance widening – permit and final designs
  • Székesfehérvár, Árpád House Territorial aspect of the central structure planned in the program, utilities – study design
  • Budapest Athletics Stadium, utilities – concept design, permit and final designs
  • Planning for water retention and land use change in the Ős-Drava Program – construction of pressure pipe – concept design, permit and final designs
  • Development of National Industrial Park Management and Development Company (NIPÜF) Páty Industrial Park, ‘G’ building water utilities – permit and final designs
  • Csór-Székesfehérvár route selection – study design
  • Dunaújváros public water supply, construction of a new tentacle well – permit and final designs
  • Tiszaújváros, MOL Petrolkémia Zrt SSBR project OSBL external utilities M7 rainwater collection channel – permit and final designs
  • Danubio project – apartment house of 355-flats, water utilities – permit and final designs
  • Harsánylejtő real estate development phase II, utilities – permit and final designs
  • Budakeszi wastewater treatment plant exploration road – permit, final designs and tender documentation
  • Hungrana Kft. project called “water base development”- permit and final designs
  • Tiszaújváros, MOL Petrolkémia Zrt SSBR project Connection of OSBL exterior utilities and roads in the factory area – permit and final designs
  • Main parts of South Buda sewage system – final designs
  • Drainage of rainwater in Szentendre Downtown – study design
  • Expansion of the existing sewerage network of the city of Miskolc – permit and final designs
  • Planning of utility within the park reconstruction related to the establishment of the University of Public Service, “Ludovika Campus” – concept design, permit and final designs
  • University of Public Service, new educational building, utility design – permit and final designs
  • University of Public Service, Sports Center, utility design – permit and final designs
  • Reconstruction of Paks Nuclear Power Plant, courtyard pipelines – final designs
  • South Buda Regional Wastewater drainage – water rights implementation approval designs

Wastewater treatment and mechanics

  • Piliscsaba wastewater treatment plant expansion – permit and final design
  • Kvassay pumping station mechanical reconstruction – final design
  • Pók street wastewater lifting plant development – permit, final and tender design
  • Expansion of the hydraulic capacity of Veresegyháza wastewater treatment plant to 7000 m3 / d. – water rights implementation approval designs
  • Elaboration of the long-term development and expansion concept of the Veresegyháza wastewater treatment plant for a capacity of 9000 m3 / d – experts’ report
  • Mobile wastewater treatment plant in Soponya – preliminary and establishing water right permit
  • Répcelak and its area wastewater treatment plant –
  • permit and final designs
  • Gyöngyös and its area wastewater treatment plant –
  • proposal documents, volume III, IV., V.
  • Development of Szentendre wastewater treatment plant – proposal documents, volume III, IV., V.
  • Development of wastewater treatment plant in Vác (KEHOP-2.2.2-15-2016-00051) – proposal documents, volume III, IV., V.
  • Expansion of a biogas plant at the Vác and Dunakeszi wastewater treatment plant – preparation of a tender plan in accordance with the FIDIC’s yellow book procedure
  • Development of a wastewater treatment plant in Vác – Design for Establishing Water Right Permit Application and preparation of public procurement technical documentation
  • New wastewater treatment plant in the city of Budakeszi – design for establishing and building water right permit application and final designs
  • Establishment of a biogas plant in Pécs – Feasibility Study, Design for Establishing and Building Water Right Permit Application
  • Reconstruction of the wastewater and rainwater drainage system of Paks Nuclear Power Plant (Paksi Atomerőmű Zrt)., Partial reconstruction of the sewage treatment plant – final designs
  • Kazincbarcika-Berente area composting plant – permit designs
  • Expansion of the Csepreg wastewater treatment plant –
  • design for establishing water right permit application
  • Establishment of a biogas plant in Miskolc – feasibility study, design for establishing and building water right permit application, final design level tender design
  • Development of the wastewater treatment plant of Nagykőrös – permit and final designs
  • MOL, D8701 Transform of oil trap – EPC (Engineering Procurement Construction) offering tender documentation
  • Ráckeve-Soroksár branch of the Danube Water – water engineering design of South Pest’s channel intake and engine compartment – permit design
  • Modernization of the disinfection of the Kőbánya Waterworks – final design
  • Replacement of water structures in Esztergom, at Kossuth Bridge and Molnár street – study design
  • Reconstruction of Budapest Waterworks’s yard at Gilice square – final design
  • Borsodchem general design of settling pool – hydraulic calculation, permit and final designs
  • Gyálai Holt-Tisza channel intake structure and related facilities – permit design and proposal documentation volumes III, IV, V.
  • Budapest Central Waste Water Treatment Plant /BCWWTP/, Expansion of a non-utility domestic wastewater receiver – final designs
  • Complex reconstruction of Hódmezővásárhely regional water system phase I, mechanical works – permit design and proposal documentation volumes III, IV, V.
  • Budapest Waterworks, Testvérhegy II. renovation of engine compartment – final design
  • Budapest Waterworks, renovation of engine compartment at Szabadsághegyi basin – final design
  • Budapest Waterworks, Csepel treatment plant, Installation of UV disinfectant – final designs
  • MOL Establishment of an independent channel intake at Dunai Finomító – study design
  • Békásmegyer reconstruction of engine compartment phases 2, 3, 4 – final designs
  • CSEPEL III. 400-450 MWe cooling water supply for a combined cycle gas turbine power plant – design for preliminary water right permit application
  • Kőbánya waterworks, modernization of disinfection -final designs
  • TVK/TIFO sites industrial water supply, long term – feasibility study
  • TVK/TIFO sites industrial water supply, short term – feasibility study
  • Paks Nuclear Power Plant external facilities of reserve water preparation’s reconstruction – final designs
  • Budapest Central Waste Water Treatment Plant /BCWWTP/, Reconstruction works of Vas Gereben Street Pumping Station – final designs
  • Győr, Modernization of the pumping station in Dél-Nádorváros – concept design
  • Paks Nuclear Power Plant, fresh water cooling of the establishment blocks – feasibility study
  •  
  • MOL, D8701 Transform of oil trap – EPC (Engineering Procurement Construction) offering tender documentation
  • Ráckeve-Soroksár branch of the Danube Water – water engineering design of South Pest’s channel intake and engine compartment – permit design
  • Modernization of the disinfection of the Kőbánya Waterworks – final design
  • Replacement of water structures in Esztergom, at Kossuth Bridge and Molnár street – study design
  • Reconstruction of Budapest Waterworks’s yard at Gilice square – final design
  • Borsodchem general design of settling pool – hydraulic calculation, permit and final designs
  • Gyálai Holt-Tisza channel intake structure and related facilities – permit design and proposal documentation volumes III, IV, V.
  • Budapest Central Waste Water Treatment Plant /BCWWTP/, Expansion of a non-utility domestic wastewater receiver – final designs
  • Complex reconstruction of Hódmezővásárhely regional water system phase I, mechanical works – permit design and proposal documentation volumes III, IV, V.
  • Budapest Waterworks, Testvérhegy II. renovation of engine compartment – final design
  • Budapest Waterworks, renovation of engine compartment at Szabadsághegyi basin – final design
  • Budapest Waterworks, Csepel treatment plant, Installation of UV disinfectant – final designs
  • MOL Establishment of an independent channel intake at Dunai Finomító – study design
  • Békásmegyer reconstruction of engine compartment phases 2, 3, 4 – final designs
  • CSEPEL III. 400-450 MWe cooling water supply for a combined cycle gas turbine power plant – design for preliminary water right permit application
  • Kőbánya waterworks, modernization of disinfection -final designs
  • TVK/TIFO sites industrial water supply, long term – feasibility study
  • TVK/TIFO sites industrial water supply, short term – feasibility study
  • Paks Nuclear Power Plant external facilities of reserve water preparation’s reconstruction – final designs

Structural design

  • Implementation of Kurca water level control structures – final designs
  • Rafting track of Kisköre – permit designs
  • Planning for water retention and land use change in the Ős-Drava Program channel intake construction 5 m3/sec – concept design- permit and final designs
  • Making Hattyas pumping station reversible in the framework of the project “Reconstruction of the Gyálai Holt Tisza”, channel intake construction and its related facilities – design for establishing water right permit application and tender documentation
  • Budapest, Giant jumping tower in Batthyány Square – final designs
  • Water tower of Debrecen – revision of modernity
  • Large surface construction in IVth district of Budapest, (Budapest Waterworks) – experts’ report and study design
  • MOL Establishment of an independent channel intake at Dunai Finomító – study design
  • Sziget II (Island II) – Balpart II (Left Side II) under surface conductor – study and final designs
  • Water tower of Szolnok – concept designs
  • Floodplain ecological corridor of Kisköre barrage, fish ladder – final designs
  • Rehabilitation of the Mártély backwater for habitat protection purposes – design for establishing water right permit application, tender and final designs
  • National port of Győr-Gönyű, mouth structure – concept, design for establishing water right permit application and tender designs

Flood protection

  • Pest-North flood protection, sections 101, 37 and 38 – permit and tender design
  • Aranyhegyi stream flood protection phase 2 – final design
  • Szeged, Additional flood protection facility associated with the Pick Arena – design for establishing water right permit application and final designs
  • Pünkösdfürdő (Barát brook) flood protection facility – final designs
  • Aranyhegyi brook flood protection facility, phase I. – final designs
  • Flood protection of the Budapest Athletics Stadium – concept, design for establishing water right permit application and final designs
  • North Buda flood protection section – preparation of a concept for a preliminary feasibility study
  • Middle Buda flood protection section – preparation of a concept for a preliminary feasibility study
  • Flood protection of Danube Arena – design for establishing water right permit application and final designs
  • Reconstruction of Malina’s shore protection under Újszeged – final design
  • “Danube Project” embankment development on the 01.05 protection section of the Mosoni Danube and on the 01.07 protection section of the Mosoni Danube on the right bank – final designs
  • Construction works of embankment development on the island of Szentendre on the 02.07 protection section of the “Danube Project” – final designs
  • Development of a new line of defence for the protection of Mecsér and Dunaszentpál villages on the 01.05, 01.07 protection section of the “Danube Project” – final designs
  • Rebuilt of embankment at Tát, Kenyérmezei and Unyi brooks – final designs
  • Flood protection development of the Danube promenade in Szentendre with a mobile dam – final designs
  • Flood protection development of Szeged river wall with mobile dam – design for establishing water right permit application, tender and final designs
Mélyépterv logó
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.